Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the constant-contact-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Martin Kenty Project | Big Gold Inc

Martin Kenty Project

Kenora/Rainy River Mining District

Large Land Package

10,100-hectare project located in a Tier 1 mining jurisdiction

Good Infrastructure

Due to the development of Rainy River Mine Complex and forestry industry

Significant Gold Potential

Mineralization identified historically – no modern exploration undertaken on the area

First-Class Technical Team

Responsible for significant Ontario gold discoveries

Exploration

Low Cost

The Martin Kenty Project hosts key attributes consistent with a gold-enriched system that is deep seated and extensive.

Gold mineralization is primarily associated with strong alteration and sulphides, a trait common to Hemlo-style gold deposits.

High Impact

]

Roy Martin Showing

Z

Historic trenching reported gold values of 2.8 g/t over ~1.5 metres – no follow-up

]

East Island Showing

Z

Reported gold values across 3 trenches:

TR1: 9.3 g/ton Au over 3.5 metres
TR2: 5.0 g/ton Au over 4.3 metres
TR3: 4.7 g/ton Au over 5.5 metres

]

Hay Island Showing

Z

Historical exploration points to potential for significant tonnage

]

Mongus Lake Showing

Z

Reported pyrite, chalcopyrite and visible gold (no Assays returned). Located 2 km from Wicks Lake Deposit

]

Exploration Low Cost

Z

All of the samples collected in the 2022 Fall Work Program were collected on mainland and accessible year-round via existing mining and forestry roads as well as a local highway.

Big Gold Inc CSE - BG Regional Geology Map_20230224_FINAL

2023 Q1-Q3 Work Program

^

The 2022 fall work program, which included field sampling, provided our technical team with important data that will help identify priority exploration targets for follow-up exploration.

^

A total of 44 grab samples were taken with more than 30% returning assays of more than 0.5 g/t Au.

^

The highlighted grab samples include Sample 260905 with 8.04 g/t Au and Sample 260926 with 8.37 g/t Au.

^

Phase 3 Exploration Program includes a test program of till sampling and lake sediment survey, and an initial drilling program of 1,500 to 3,000 metres.

Sample ID

g/t Au

260905

8.04

260924

3.80

260925

2.62

260926

8.37