TABOR PROJECTs

shebandowan greenstone belt

Land Package

3, 120-hectare project located immediately east of Goldshore’s million ounce Moss Gold Project

Good Infrastructure

Long history of mining operations and highway runs through the property.

Significant Gold Potential

Historical exploration included drilling, trenching, and extraction of 47 tons of mineralized material – some of which was processed recovering approximately 8 g/t Au.

First-Class Technical Team

Responsible for significant Ontario gold discoveries

Tabor Project (TBR)

Historical Exploration

Gold Mineralization reportedly associated with quartz, shearing and sulphides including pyrite, pyrrhotite, sphalerite, and chalcopyrite.

Sporadic exploration over the past 70 years with drill programs first undertaken in 1955, then again in 1960s, and in 1983. 

Work carried out by Realm Mining Corporation was sufficiently interesting that in 1960 The Northern Miner wrote an article that reported:

“…the drill holes tested the zone over a length of 200 feet and indicated a grade of 1.38 ounces of gold per ton across an average width of 4.1 feet. The best intersection is reported to have assayed 2.00 ounces of gold per ton over a true width of 5.1 feet”.

2023 Q1-Q3 Work Program

^

Field sampling and trenching

^

IP survey

^

Initial drilling program of 1,500 to 3,000 metres