TABOR PROJECTs
shebandowan greenstone belt
Land Package
Good Infrastructure
Significant Gold Potential
First-Class Technical Team
Tabor Project (TBR)
Historical Exploration
Gold Mineralization reportedly associated with quartz, shearing and sulphides including pyrite, pyrrhotite, sphalerite, and chalcopyrite.
Sporadic exploration over the past 70 years with drill programs first undertaken in 1955, then again in 1960s, and in 1983.
Work carried out by Realm Mining Corporation was sufficiently interesting that in 1960 The Northern Miner wrote an article that reported:
“…the drill holes tested the zone over a length of 200 feet and indicated a grade of 1.38 ounces of gold per ton across an average width of 4.1 feet. The best intersection is reported to have assayed 2.00 ounces of gold per ton over a true width of 5.1 feet”.
2023 Q1-Q3 Work Program
Field sampling and trenching
IP survey
Initial drilling program of 1,500 to 3,000 metres